%20(1).jpg)
SOUTH BATTERY PARK CITY RESILIENCY PROJECT
Location
New York, NY
Completion Year
2023
Client
Battery Park Authority
Project Summary
SLS was contracted by Battery Park Authority to provide construction services for the Pier A Plaza and The Battery site work component (the “Pier A/Battery Services") as well as the near-surface drainage isolation (“NSI”) construction work (the “NSI Work”) of the South Battery Park City Resiliency Project. The Pier A/Battery component of the work will involve installing a flood barrier system as well as demolition, re-grading, and re-construction of specified landscape elements at Pier A Plaza and The Battery. The flood barrier system will entail the construction of deployable flipup gates, the raising of the existing at-grade site elevation with a reinforced concrete wall, and the installation of exposed flood walls that will span the Battery Tunnel Underpass and the Brooklyn — Battery Tunnel. The NSI Work will consistent of the installation of an interceptor isolation gate within the existing regulator structures, which would be closed during a flood event to prevent the flow of storm surge from rising through the interceptor line and reaching the street level.
.png)
.jpeg)
